Case Study

Case Study: Design-Build Lift Station Garners Award

design-build-lift-station_450x300

Hazelwood West High School’s on-campus lift station serves approximately 2,400 students and 300 faculty and staff. Installed when the suburban St. Louis high school was constructed in 1969, the original pumping system comprised an underground, dry-pit Smith & Loveless pump station connected to a buried wet well. In late spring 2009, after nearly 40 years of faithful service, school officials determined that a new station was required.

access the Case Study!

Get unlimited access to:

Trend and Thought Leadership Articles
Case Studies & White Papers
Extensive Product Database
Members-Only Premium Content
Welcome Back! Please Log In to Continue. X

Enter your credentials below to log in. Not yet a member of Water Online? Subscribe today.

Subscribe to Water Online X

Please enter your email address and create a password to access the full content, Or log in to your account to continue.

or

Subscribe to Water Online