Articles


Snug Cove WWTP, Bowen Island, BC

August 27, 2008

Request Information

Click Here To Download:
Case Study: Snug Cove WWTP, Bowen Island, BC

This 180 m3/d (50,000 gpd) advanced wastewater treatment plant serves the existing commercial center, a school and a new subdivision of a summer recreational and bedroom community located on an island a short ferry ride from Vancouver.

Due to limited space available, the plant was installed within a community park. Small footprint, noise reduction design, and ‘no' odor nature of the USBF process combined to make the installation possible.

Click Here To Download:
Case Study: Snug Cove WWTP, Bowen Island, BC

SOURCE: ECOfluid Systems, Inc.

ECOfluid Systems, Inc.

More From ECOfluid Systems, Inc.

Please wait... busy

Send This Page To An Associate: